The project concerns planning activities, road adjustments as well as the realization of the road in Via Birreria in Bellinzona. The total length of this road will be around 920 m (from the future Torretta gangway till the bridge on the Righetti channel), a new cycle path with length around 280 m and a new sidewalk. Both are on the valley side. The adjustment in via Birreria also concerns: complete renovation of the rainwater collection and drainage system, renovation and realization of new anchored and non anchored retaining walls, adjustment of private accesses, modification of the existing infrastructures layout and adjustment of road signs and surface marking.