Innovating with experience

SBB protection works, BIASCA – SWITZERLAND

The project concerns the realisation of new protection works and the improvement of the existing solutions on the SBB line from km 133,500 to km 136,000 in Biasca and Osogna and aside the mountain. MSE and gneiss walls, as well as reinforced concrete walls have been realised. Also following activities have been performed: raising of […]

New Bus lane in Via Zorzi, BELLINZONA – SWITZERLAND

The project concerns the construction of the new bus lane, located on the right side of Via Zorzi in Bellinzona towards the centre, which follows the existing road layout for a total length of about 250 m. As part of the project, following activities have been performed: new bus stop with reinforced concrete shelter, widening […]

Road and cycle path adjustments, Via Birreria, BELLINZONA – SWITZERLAND

The project concerns planning activities, road adjustments as well as the realization of the road in Via Birreria in Bellinzona. The total length of this road will be around 920 m (from the future Torretta gangway till the bridge on the Righetti channel), a new cycle path with length around 280 m and a new […]

Housing complex La Fontana, BISSONE – SWITZERLAND

The project concerns the realisation of 2 buildings with 10 flats of different sizes and an underground parking; the total volume is 5600 m3. The housing complex oriented west is placed on a hill closed to the wood; for the excavation it was necessary to preview provisional retaining walls on a total surface of around […]

ATG – L609 Buzza disposal area, BIASCA – SWITZERLAND

The project concerns one of the lots of the new ATG railway line in Biasca and the realization of the definitive disposal area for material coming from the excavation of the Gotthard Base Tunnel and not used in the project. Conveyor belts were used in order to move this material through the passage Pollegio Nord-Buzza […]