Innovating with experience

Streams inspection and evaluation, LUGANO – SWITZERLAND

The project concerns the inspection and evaluation of channels and underground watercourses in Lugano. Total length: around 2’000 m. Visual inspections of watercourses have been carried out with remote control (video inspection) or inspection of pipe watercourses have been carried out depending on accessibility and pipe diameter. After the report delivery, the analysis and evaluation […]

General wastewater disposal plan, CURIO – SWITZERLAND

The project concerns the realisation of the new general wastewater plan in accordance with specific directives of Swiss water associations, with cantonal guidelines and existing technical specifications. It contains the necessary wastewater disposal information, such as: canalisations to rehabilitate or to replace, canalisations to realise, priorities, necessary works, construction, maintenance and operating costs, cantonal and […]

New consortium collector middle and lower BLENIO – SWITZERLAND

The project concerns the construction of the connection manifold to the consortium of the water purification consortium of the Middle and Lower Blenio (CDAMBB), with a total length of approx. 17 km and variable diameter from 200 to 450 mm depending on the needs of the various lots; it includes the areas Malvaglia, Semione, Ludiano, […]

ATG – L626 Deviation and relocation of the Froda river, BIASCA – SWITZERLAND

As part of the project relating to the Giustizia Junction (Lot 626) of the new ATG railway line in the Biasca area, it was necessary to divert the course of the Froda river/Ofible canal for the construction of the railway bridge of the same name. The Froda river/Ofible canal receives water from the rivers Stabiello […]

ATG – L626 Stabiello channel and cofferdam, BIASCA – SWITZERLAND

The project interchange Giustizia (L626) of the new ATG railway line in Biasca concerns also the realisation of the Stabiello channel and cofferdam. Aim of the structure is to protect the railway line and the road from debris flows in case of flood. Designed and realised to host a volume of 5500 m3, it has […]