The project concerns inspections in the years 2013, 2018 and 2023 for tunnel Schweizerhalle (1030 m) and tunnel Arisdorf (1349 m). After a first KUBA training phase, the structures data have been defined and collected; the main inspection (control, analysis and evaluation of each single structural element) and, finally, the final documentation with the proposed intervention concept have been performed.